Derivatives · glossary

All-in cost

The cost of the loan and the hedge together: loan interest, plus what Atlas pays on the swap, less what it receives. In the first quarter it was €550,000. On the hedged part it stays the same whatever the fixing. Hedge Sheet 1 · Chapter 2

Explained in Chapter 2, The Swap, Line by Line, of Derivatives.

How it comes up, in Chapter 2
A swap becomes a hedge only beside the loan it hedges. The loan costs EURIBOR plus a margin of 3%. In the first quarter that is 7% on €35,000,000, or €612,500. The swap pays €62,500 back, so the quarter's all-in cost (the total cost under both contracts) is €550,000.
Read Chapter 2, The Swap, Line by Line →

Chapter 1 and this glossary are open to everyone; the whole edition is free to read with a free account until 31 January, and it stays open to an account opened by then.

Related terms

Where this term lives

This term is part of one complete fictional deal, with every document attached and a test after every chapter. Open Derivatives → · All terms A–Z →